What to prepare
- A public project matching the current inclusion criteria.
- A valid category and an unused project identity.
- An approved structured project entry, current source rules and verified contributor access.
Inclusion and ranking are separate
A merged project entry can still be ranked below more established repositories. The paid action is the checked contribution and supported follow-through; public metrics and the list generator control the resulting rank.
Submission workflow
- Check the current project schema and inclusion criteria.
- Review the exact proposed metadata addition.
- Authorize its checked PR and retain the provider receipt.
- Confirm merged project source; ranking is determined by the list.
Blockers to resolve before review
Use these as preparation checks. The destination makes its own acceptance decision.
- Duplicate identity or unsupported project metadata.
- A listing that fails the current inclusion criteria.
Primary sources
Checked 2026-10-29. Follow the destination’s current instructions if its requirements change.